Completed: multifunctional office and switching station building for 50hertz

Completed: multifunctional office and switching station building for 50hertz

The new building for 50Hertz Transmission GmbH located in Berlin-Charlottenburg has been completed. Modern, flexible offices on the upper floors and a canteen are now available for the approximately 100 employees. The hall for a 110kV switching station, control rooms and garages for trucks are located on the ground floor.
A curtain wall with light grey metal cladding is attached to a two-storey base made of dark grey fibre cement panels. A colourful play of rotatable perforated sheet metal lamellas shadows the window areas facing the lounge areas.
The construction was carried out while the transformer station was in operation – design and realisation by DGI Bauwerk.

FURTHER INFORMATION