• Bau Laborgebäude Helmholtz Zentrum Berlin
  • Bau Laborgebäude Helmholtz Zentrum Berlin

HELMHOLTZ-ZENTRUM BERLIN, NEW CONSTRUCTION OF THE LABORATORY BUILDING TEM

The TEM requires special installation conditions such as low magnetic interference and mechanical vibration of the building. These requirements are now being implemented in a free-standing laboratory building, which is connected via a corridor to the user centre.

HOAI work stages

2-9

Period

2005 - 2007